Exeter, NH

Exeter Wastewater Treatment Facility Upgrade

Nutrient removal and wastewater conveyance

Exeter replaced an aerated lagoon process with a plant designed for biological nitrogen removal. The upgrade also rebuilt critical conveyance infrastructure serving the Squamscott River and Great Bay watershed. [1] [2]

Explore the site on the map

Aerial view of the Exeter facility with circular clarifiers and a rectangular treatment reactor
The aerial view shows the circular clarifiers and the rectangular treatment reactor.Goran Kovacevic project portfolio and Dutchland project imagery
Total upgrade cost [1]
$53.5M
Plant design flow [1]
3M gal/day
Residents served · 2022 [4]
12,736
Plant contract amount, as reported by Apex [3]
$36.87M

Why it happened

Exeter needed to address aging treatment infrastructure and reduce nitrogen entering the Squamscott River and Great Bay. The town serves wastewater customers in Exeter and portions of Stratham and Hampton. [2] [5]

What was built

The plant uses a four-stage Bardenpho process for biological nitrogen removal. The program also upgraded the main pump station, installed two force mains, and added a septage receiving station. [1] [2]

What changed

EPA reports that nitrogen levels fell within a month of startup in June 2019. The agency also credits the continued use of the existing lagoons and the main pump station upgrade with eliminating most of the town’s combined sewer overflows. [2]

Project team

Owner
Town of Exeter [1]
Design and construction administration
Wright-Pierce [3] [5]
Plant construction · Contract 1
Apex Construction [3]
Precast package
Dutchland

My role

I managed the schedule, fabrication, and field installation for the precast package, which included a 70-foot clarifier.

Project photos

Site location

See the upgraded treatment basins beside the former lagoon area and the Squamscott River.

Project records

  1. Wright-Pierce · Exeter wastewater upgrades

    Program scope, treatment process, plant capacity, and total upgrade cost.

  2. EPA · Clean Water State Revolving Fund case study

    Financing, nitrogen removal, and combined sewer overflow results.

  3. Apex Construction · Project qualifications filed with Biddeford

    Plant contractor, engineer, completion date, and contractor-reported contract amount.

  4. EPA · 2022 Clean Watersheds Needs Survey

    Residential population reported for the treatment facility in the 2022 Clean Watersheds Needs Survey. View facility survey data (JSON)

  5. Wright-Pierce · Engineering project profile

    Service area, plant design, and engineering scope.

Software capture

World population · Estimated

A changing estimate of the people sharing this planet.

Archo interpolates between two United Nations World Population Prospects 2024 medium-variant projections:

The display spreads that projected change evenly across elapsed UTC time between those dates. It uses your device clock and updates once per second. It is a modeled illustration, not a live census or a count of observed births and deaths. Its individual digits do not represent measurement accuracy.

Reference date: 1 July 2026.

United Nations · World Population Prospects 2024 ↗
Source workbook · Medium variant · World · July population ↗

Source values converted from thousands to people. Retrieved 30 October 2026. CC BY 3.0 IGO; interpolation by Archo. No UN endorsement implied. Outside the two reference dates, the readout shows the nearest dated projection and stops updating. Reduced-motion preference starts the counter paused.