Reading, PA

Fritz Island Wastewater Treatment Plant Upgrade

Wastewater treatment upgrade

Reading rebuilt major treatment systems at Fritz Island while continuing to treat the region’s wastewater. The work was phased so new treatment capacity could come online before crews completed the remaining construction. [2] [6]

Explore the site on the map

Aerial view of Fritz Island with circular clarifiers and a rectangular process reactor under construction
Aerial view of the treatment site. The rectangular reactor sits alongside the plant’s circular treatment structures.Goran Kovacevic project portfolio and Dutchland project imagery
Treatment plant construction project [5]
$148M
City-reported plant design flow [1]
28.5M gal/day
Residents served · 2022 [4]
114,667
Precast pieces in the reactor [6]
603

Why it happened

The existing plant needed upgrades to comply with a consent order and stricter discharge requirements. It serves Reading and surrounding municipalities and discharges treated water to the Schuylkill River. [1] [2] [3]

What was built

The liquids work replaced trickling filters with activated-sludge treatment. It included a precast process reactor and four final clarifiers. The contractor put the first phase into service before completing the remaining clarifiers so the plant could keep treating wastewater. [2] [6]

What changed

The upgrade modernized both liquid treatment and solids handling on an operating site. The City reports a design flow of 28.5 million gallons per day for the plant and wastewater from 12 municipalities. EPA reports the served population separately in its 2022 facility dataset. [2] [1] [4]

Project team

Owner and operator
City of Reading [1]
Treatment upgrade designer
RK&K [2]
General contractor
M.F. Ronca & Sons [6] [5]
Construction management
Hazen and Sawyer is identified for the plant work in the precast case study. Hill International describes its role in the broader upgrade program. [6] [3]
Precast reactor and final clarifiers
Dutchland [6]

My role

I developed preliminary designs and bid drawings, prepared the estimate, and planned site logistics and material staging for the precast scope.

Project photos

Lifting equipment beside a precast wall panel at Fritz Island
Crews set a precast wall panel inside the reactor construction area.Goran Kovacevic project portfolio and Dutchland project imagery
Workers along the wall of the concrete process reactor
Reactor walls and the working area during construction.Goran Kovacevic project portfolio and Dutchland project imagery

Site location

See the treatment basins on Fritz Island and their setting along the Schuylkill River in Reading.

Project records

  1. City of Reading · Wastewater conveyance and treatment

    Owner, design flow, and municipal service area.

  2. RK&K · Fritz Island treatment upgrade

    Design scope, discharge requirements, and changes to the treatment process.

  3. Hill International · Upgrade program

    Broader program scope, including conveyance work and construction management.

  4. EPA · 2022 Clean Watersheds Needs Survey

    Residential population reported for the treatment facility in the 2022 Clean Watersheds Needs Survey. View facility survey data (JSON)

  5. EFCO · Fritz Island construction

    Treatment plant construction project value and contractor.

  6. Dutchland · Precast reactor and clarifiers

    Phasing, precast scope, and reactor piece count.

Software capture

World population · Estimated

A changing estimate of the people sharing this planet.

Archo interpolates between two United Nations World Population Prospects 2024 medium-variant projections:

The display spreads that projected change evenly across elapsed UTC time between those dates. It uses your device clock and updates once per second. It is a modeled illustration, not a live census or a count of observed births and deaths. Its individual digits do not represent measurement accuracy.

Reference date: 1 July 2026.

United Nations · World Population Prospects 2024 ↗
Source workbook · Medium variant · World · July population ↗

Source values converted from thousands to people. Retrieved 30 October 2026. CC BY 3.0 IGO; interpolation by Archo. No UN endorsement implied. Outside the two reference dates, the readout shows the nearest dated projection and stops updating. Reduced-motion preference starts the counter paused.