Fort Lauderdale, FL

Prospect Lake Clean Water Center

Drinking water treatment · Public-private partnership

A new drinking water plant replaces Fiveash’s treatment function and strengthens the water supply for Fort Lauderdale and surrounding communities. The City celebrated its opening on October 15, 2026. [1]

Explore the site on the map

Aerial view of the Prospect Lake Clean Water Center showing treatment equipment, tanks, and buildings
The new treatment campus at Prospect Lake.Photo from IDE Technologies
Design treatment capacity [1]
50M gallons/day
Approximate investment, including related infrastructure [1]
$666M
Groundwater source [3]
Biscayne Aquifer
Opening celebrated [1]
October 2026

Replacing a regional water system’s treatment plant

Fiveash opened in 1953. Its replacement had to be built at another site because water service needed to continue and the existing property lacked room for the new plant. [4]

Prospect Lake produces treated water that travels to Fiveash for storage and distribution. The City began the phased transition in September 2026, with Fiveash taking on its new role as the treatment system changes over. [1] [4]

Treatment and resilience

The plant treats groundwater from the Biscayne Aquifer using nanofiltration and ion exchange. Its design also includes pressurized multimedia filters and stripping towers. [3]

Kiewit serves as design-builder and engineer of record. Its delivery approach brings design and construction planning together, with a facility engineered for Category 5 hurricane-force winds. [2]

Project team

Owner
City of Fort Lauderdale [1]
Design-builder
Kiewit Water Facilities Florida Co. [2]
Engineer of record
Kiewit’s in-house design team [2]
Private project partners
IDE Technologies and Ridgewood Infrastructure [1]
Operating arrangement
30-year public-private partnership [3]

My role

I worked with Kiewit to develop the tank solution and bring the project to Dutchland, including preparing proposals and pricing.

Prospect Lake under construction, with cranes, blue tanks, treatment equipment, and concrete structures across the site
The treatment campus taking shape during construction.Photo from Kiewit’s public project update

Site location

The new plant occupies the Prospect Wellfield site. Fiveash remains part of the water system as a storage and distribution facility. [4]

Project records

  1. City of Fort Lauderdale · October 2026 opening announcement

    Opening date, treatment capacity, total investment including related infrastructure, and project partners.

  2. Kiewit · Design-builder selection

    Design-build responsibilities, engineer of record, and hurricane-resilience design.

  3. IDE Technologies · Prospect Lake project profile

    Groundwater source, treatment processes, operating arrangement, and campus photograph.

  4. City of Fort Lauderdale · Water treatment plant and transition information

    Fiveash’s changing role, site selection, and the phased water-system transition.

  5. Kiewit · Construction progress update

    Public aerial construction photograph.

Software capture

World population · Estimated

A changing estimate of the people sharing this planet.

Archo interpolates between two United Nations World Population Prospects 2024 medium-variant projections:

The display spreads that projected change evenly across elapsed UTC time between those dates. It uses your device clock and updates once per second. It is a modeled illustration, not a live census or a count of observed births and deaths. Its individual digits do not represent measurement accuracy.

Reference date: 1 July 2026.

United Nations · World Population Prospects 2024 ↗
Source workbook · Medium variant · World · July population ↗

Source values converted from thousands to people. Retrieved 30 October 2026. CC BY 3.0 IGO; interpolation by Archo. No UN endorsement implied. Outside the two reference dates, the readout shows the nearest dated projection and stops updating. Reduced-motion preference starts the counter paused.